BD766 high temperature anti corrosion wear abrasion resistant epoxy ceramic coatings:
Packing specification:
25Kg/group,packed in a plastic drum or iron drum.
Performance feature:
1. Excellent in wear & corrosion resistance
2. With very high bonding strength to metal substrates
3. Convenient for construction,without very high technical requirements for constructors
4.Suitable for the protecting of high temperature wear working condition
5.Can do blade coating directly for both facade and ceiling,don't drip and slip,without the support
Product usage:
Two component,fine particle,room temperature curing,wear resistant,the highest temperature resistant is 600¡æ,used in the wear resistance of flue
Performance index:
BD766 high temperature wear resistant coatings performance index | ||||
product name | physical state | color | operational time limit(25¡æ) | can put into using time(25¡æ) |
BD766 high temperature wear resistant coatings | paste | yellow | 40min | 7d |
BD766 Physical mechanical properties table | ||||||
density (g/cm3) | compressive strength(Mpa)GB1041-2008 | tensile strength (Mpa)GB6329-2009 | shear strength(Mpa)GB7124-2008 | - |
hardness£¨ShoreD£© ASTM-D-255 |
working temperature of ensuring wear resistance£¨¡æ£© |
2.1 | 65 | 4 | - | -60¡«600 |
How to use:
1.Surface treatment:Do coarsening treatment on the pending-repair part,grinding with angle grinder or sand blasting etc,the surface after coarsening treatment should be cleaned,the surface after this treatment should be the one coarsening,dry and fresh substrates,should be no greasy dirt and dust.
2.Preparation:According to weight ratio A:B=4:1,make A and B two components mix uniformly,and use it up within 40 min.Generally it’s while construction and configuration.Every time the most configuration quantity is not more than 20Kg,too much adhesive is solidified too fast,hasn’t been used up until the adhesive has partial solidified and can’t be used.According to the actual temperature,configuration can be properly a little more in winter and proper less in summer.
3.Coating:The suitable coating thickness of BD766 high temperature wear resistant coatings is 1-4mm.Make the mixed-up material be coating on the pending-repair part layer by layer,the first layer should be compacted,make it infiltrates fully with the substrates.The thickness of each layer should be controlled under 0.5£1mm,spread coating the next layer after the upper layer drying,the application time of coating for two successive is depend on the construction temperature and coating thickness,it's more than 10 hours in winter based on 0.5mm coating thickness,but more than 4 hours in summer.The principle which we should grasp is that coating on the next layer after the upper layer drying.
4. Curing:After the coacting is coated in the specified size,generally we need to place it for 2-3 days before putting into use.
Transportation storage:
1.Sealed storage in the cool and dry place,the warranty period is 12 months
2.Avoid placing it upside down,knocking against and transporting it as a non-dangerous product during transportation.
Product packaging photo of BD766 high temperature anti chemical corrosion abrasion wear resistant coating: